The King High Project
A full exterior build in Toronto, handled end to end by the Pisces crew: drainage, grading, landscaping, sod, driveway, heated driveway, interlock and a retaining wall. Right now the ground work is underway — lot grading around both buildings and the front-yard soakaway pit for the drainage system. Follow along as the site takes shape.













Watch: grading & drainage in progress
The site film — about a minute on location at the King High Project, from layout lines and the soakaway excavation to the final grading passes.
Drainage, engineered — the soakaway system
Roof water from both buildings is collected and soaked safely into the ground on site — no flooding, no pooling against the foundation. The pit is wrapped in Terrafix 270R geotextile, filled with 38–50 mm clear stone around a perforated distribution pipe, capped with pea gravel, and fitted with a test well and an overflow to a splash pad — built to the engineered plan.
Full project scope
One contract, one crew, every exterior trade sequenced properly — drainage and grading first, surfaces and finishes as the build moves forward.
Planning a build like this?
Free estimates across Toronto and the GTA — drainage, grading, interlock, heated driveways, retaining walls and full landscaping.
647-860-0400 info@pisceslandscaper.ca More field updates →